How Long Does Warehouse Construction Take From Design to Handover?

How Long Does Warehouse Construction Take From Design to Handover?

Building a warehouse is a big project and it takes time. Modern construction processes are able to bring down the time required for construction and when you are working with an experienced warehouse construction company, you will surely be able to avoid project delays. In general, a standard warehouse takes about 4 to 9 months, while building one with complex infrastructure may take more time.

Warehouse construction timeline according to various phases

Site assessment and feasibility

Feasibility studies, soil testing, evaluation of the land, surveys and assessing the utilities are done in this phase. It takes about 3 weeks to finish this stage.

Designing and approval

Once the designs for the warehouse are complete, they are sent to various authorities for approval. It takes from 3 to 8 weeks to finish all the required protocols. When the warehouse construction contractor is in proper coordination with other service providers, this phase takes less time.

Foundation work

After approval, the foundation construction begins. This phase involves excavation, earthwork, reinforcement and foundation construction. The time required to finish this phase may be about 4 to 8 weeks.

Erection and fabrication

Structural components can be fabricated while the foundation construction is going on. If you choose a reliable PEB manufacturer in Gujarat, you will surely be able to streamline the steel fabrication and delivery. The PEB structures will be timely delivered to the site and erected within 4 to 8 weeks.

MEP, flooring and finishing works

In this phase, the mechanical, electrical and plumbing systems are installed and the roofing, flooring, drainage, lighting, and cladding works are also done. Depending on specifications, this phase may take 4 to 8 weeks.

Final testing and handover

This is the final stage that includes inspection, testing for safety, commissioning of equipment, correction of defects, documentation and final handover. The final phase takes not more than 3 weeks.

Reasons for delays in warehouse construction projects

There are several factors which can be responsible for delays in the industrial warehouse construction timeline. Some of them are:

  • Delays in getting approvals and other necessary documents.
  • Unexpected condition of soil or foundation.
  • Changes in design in the middle of construction.
  • Delays in material procurement.
  • Issues with fabrication or steel supply.
  • Poor coordination between the contractors.
  • Poor weather conditions.
  • Delay in equipment delivery or MEP installation.

When you hire an experienced industrial construction company for construction of your warehouse, you can be assured that the mentioned causes will not delay your project. It is the responsibility of the reliable warehouse construction services to ensure proper planning, procurement, quality control and perfect coordination throughout the entire project.

FAQs

  1. Is it possible to build a warehouse by using PEB structures only?

Well, the majority of the construction work can be done using PEB structures. But the foundation construction cannot be avoided. The foundation must be built on site.

  1. Is the PEB construction method really fast?

Yes, PEB construction is the fastest option as major part of the structural fabrication takes place away from the site and can be done while the foundation construction is in progress.

  1. Why is it necessary to ensure proper coordination between contractors?

Proper coordination will ensure fewer delays in every step of the warehouse construction project.